Brenda and John Heeringa

"Over the last several years we have benefited from Interco's docking systems. We first met Ben a few years ago when he helped us design our new dock. It was a dock that was totally disassembled and removed from the water. In addition to the dock, Ben helped us design and install a marine railroad. We have a very steep bank so the rail system was quite a challenge but it worked beautifully for our needs.


Then two years ago we needed to modify the dock to allow for a lifting system so that we did not have to remove the dock's aluminum frame. Again Bob, Ben and his team installed the lift system we now have in place, including a winch system for raising and lowering the frame, and a hinged set of steps. We have gone through 2 winters now and the frame hasn't moved an inch. Then we needed to add a section to accommodate our boat. Again, it was a seamless addition.


For the last 2 years Ben and his team have put the dock in and out with efficiency and care. We are very pleased with the work that has been completed by Ben and Interco Fabrications!

Previous
Previous

Jon Prins

Next
Next

Christine and Len Puma